TRANSPORT INFRASTRUCTURES
Pigra is committed to promoting the development of a modern, comfortable, sustainable, efficient and environmentally friendly transportation infrastructure. We have a team of engineers, architects and geologists who develop from the preliminary phase, feasibility studies, projects and specialized annexes, construction management and technical assistance in the execution phase and studies of repair, maintenance and inspection of bridges and crossing works.
At the same time, the development of the linear works, cause the existence of factory works. The knowledge of a wide range of structural solutions, of different materials and of the stages through which a structure passes, allows Pigra to obtain the optimal solution from its conception and design to its rehabilitation and reinforcement, including the study of different types of foundations, pathologies, technical assistance on site and support in research on structures and their materials.
Some of our projects:
New weave lanes in the Barcelona direction on the C-58 highway, between the Sant Pau junction in Sabadell and the B-30 highway. Section: Badia del Vallès Sabadell.
Client: Infraestructures.cat
Arrangement of accesses and new junction on the C-17 road. Section: Granollers – Lliçà d’Amunt.
Client: Infraestructures.cat
Improvements to the C-35 road surface and conversion to a 2+1 road.
Improvement of the surface characteristics of the road surface and re-study of the cross section of the C-35 road, converting it into a 2+1 road. Section: Villalba Sasserra – Sant Celoni.
Client: Infraestructures.cat
Ronda Oest of Sabadell
Construction of the new Ronda Oest of Sabadell from the C-58 to the Matadepera road. Construction Management for the client.
Client: Infraestructures.cat
New road connection to Olost
New road connection from the C-25 highway to the C-154 road. Sections of Muntanyola, Olost and Sant Bartomeu del Grau.
Client: Infraestructures.cat
Extension of the C-32 highway
Northern extension of the C-32 highway from Palafolls to Tordera, including two 950 m span viaducts over the Tordera river.
Client: Abertis
Road widening and improvement
Widening and improvement of the C-1412 road. Biscarri-Figuerol d’Orcau section. Construction Management.
Client: Infraestructures.cat
Design and Construction Management of a new viaduct in Tremp
Design of a mixed viaduct on the Tremp reservoir over the C-13 road.
Client: Infraestructures.cat
Widening of the C-260 in Figueres
Widening and improvement of the C-260 in Figueres, Girona. Construction Management.
Client: Infraestructures.cat
Improvement and modernization of Trambaix
Improvement of lines T1, T2 and T3 of the Trambaix in Barcelona. Address of Work.
Customer: TMB